Request a quote
HT 8B41207NEST 26-1187 · PART 07

Plate cut to your drawing, 3/16″ to 8″ thick.

A36/44W through AR500, stainless and 6061 on the racks in Tillbury Reach. Plasma, oxy-fuel, waterjet and fiber laser under one roof. Price a part and see the arithmetic before you call.

Today on table 2

26-1187-01HT 8B4120726-1187-02HT 8B4120726-1187-03HT 8B4120726-1187-04HT 8B4120726-1187-05HT 8B41207
Remnant end of nest 26-1187. Heat 8B41207 is stencilled at the mill and stays on the drop.
26-1187-01HT 8B4120726-1187-02HT 8B4120726-1187-03HT 8B4120726-1187-04HT 8B4120726-1187-05HT 8B41207
Nest 26-1187: 61 parts from one 1.000 × 96 × 240 A36/44W plate, heat 8B41207. Torch start lower right, kerf comp on, inches.
HD plasma
to 1-1/2″
Oxy-fuel
to 8″
Waterjet
to 6″, any metal
Fiber laser
to 1″
Press brake
400 t × 14 ft
Welding
CWB W47.1 Div. 2

Released before 1:00 pm

Send the drawing. Get the arithmetic back.

An estimator replies within four working hours, 7:00 am to 4:30 pm. Stock-grade blanks released before 1:00 pm ship in one to two working days.

Dwg HPP-WEB-002Sheet 2 of 5Price a part

Price a part, see the arithmetic.

Pick the plate, give us the size, holes and quantity. The worksheet prices it from this month's mill band and shows the day it ships.

Price a part

Sheet
1 of 2
Prices
CAD, this month's mill band

Pick the plate, give us the outside size, holes and quantity. The worksheet shows the weight, the process we'd run it on and why, and a price range with every line of arithmetic. Prices are this month's, in Canadian dollars.

Part

Material

Stocked in AR400: 3/16″ to 3″

in

12.000 in, 304.8 mm

in

24.000 in, 609.6 mm

Outside dimensions of the part, or its bounding rectangle. Inches, fractions or mm.

Holes
4
in

0.813 in, 20.6 mm

pcs

Profile tolerance you need
Cut process

Plate weight

40.54 lb per piece, 18.39 kg

973.1 lb for 24 pcs, 441.4 kg

Blank
12.000 × 24.000 × 0.500 in
144.000 in³
Less holes
4 × π/4 × 0.813² × 0.500
−1.037 in³
Net volume
142.963 in³
Density
7.85 g/cm³ × 16.387 cm³/in³ ÷ 453.59 g/lb
0.2836 lb/in³
Per piece
142.963 × 0.2836
40.54 lb
Order
40.54 × 24
973.1 lb

Carbon and AR plate both run at 7.85 g/cm³: 40.84 lb per ft² per inch of thickness.

Process

Abrasive waterjetRecommended

AR400 gets its 360–440 BHN from quench and temper. Plasma, laser and oxy-fuel all soften a band behind the cut and leave a brittle re-cast skin in the holes. Waterjet cuts cold: no heat-affected zone, full hardness right to the edge, and holes you can still countersink.

Kerf
0.038″
Profile tolerance
±0.010″
Heat-affected zone
None
Cut speed
5.1 in/min
Smallest hole
Ø0.063″
Setting
0.014 / 0.040 in, 80 mesh garnet
Edge
Satin, sand-blasted texture. No dross, no hardened skin. Taper under 0.003" per inch of thickness. No thermal zone.

Nest

77 per 96 × 288 sheet your 24 use 31% of one sheet

REMNANT

Parts spaced 0.500″ apart, 0.500″ edge trim. The uncut remnant goes back on the rack with the heat number painted on it, and you pay only for the parts’ blanks.

Price range, CAD

$3,587–$4,302

$149 to $179 a piece before tax, FOB Tillbury Reach

Material
(12.500 × 24.500) × 0.500 × 0.2836 = 43.43 lb charged, × 24 × $1.86–2.18/lb
$1,939–$2,272
Cutting
82.2 in ÷ 5.10 in/min + 5 pierces × 12.0 s = 17.12–21.35 min/pc, × 24 × $225/h
$1,541–$1,922
Handling
$0.95 × 24: heat-mark, destack, deburr
$23
Setup
Programming and nesting, once per job
$85
Total
$3,587–$4,302

The low end prices a plain rectangle at the bottom of this month’s mill band. The high end allows 30% more cut path for notches and radii, at the top of the band. Your drawing pins it down.

Ships Friday, November 13 if released by 1:00 pm, 5 working days on waterjet.

Same part, every process

ProcessPer pieceToleranceHAZShipsNotes
Plasma$91.06–$106±0.0300.0223 daysCan do
Oxy-fuel————Holds ±0.060″ at this thickness; you asked for ±0.030″.
Waterjet$149–$179±0.010none5 daysRecommended
Laser$91.37–$107±0.0050.0092 daysCan do

Online estimates are indicative and expire with the mill price band at month end. A firm quote comes back within four working hours of your drawing.

Lead times

Sheet
2 of 2
Release cut-off
1:00 pm, Mon–Fri

Working days from a released order: drawing approved, PO in hand, before 1:00 pm. The burn floor runs two shifts, 6:00 am to 12:30 am, Monday to Friday. Dates below are counted from today.

  • Cut-to-size blanks and stripsSheared or plasma-stripped, stock grades
    1–2 daysships Mon Nov 9 to Tue Nov 10
  • Fiber laser profilesTo 1″ mild steel
    2–3 daysships Tue Nov 10 to Wed Nov 11
  • HD plasma profilesTo 1-1/2″
    3–4 daysships Wed Nov 11 to Thu Nov 12
  • Oxy-fuel, heavy plateOver 1-1/2″, to 8″
    4–6 daysships Thu Nov 12 to Mon Nov 16
  • Waterjet, any materialAR, stainless, aluminum, to 6″
    5–7 daysships Fri Nov 13 to Tue Nov 17
  • Cut and formedAdds 2–3 days of brake time
    5–8 daysships Fri Nov 13 to Wed Nov 18
  • Welded assembliesCWB W47.1, W59 inspection
    8–15 daysships Wed Nov 18 to Fri Nov 27
  • Plate not in stockMill or distributor order, then cut
    10–17 daysships Fri Nov 20 to Tue Dec 1

Rush burn queue

Stock-grade profiles released by 9:00 am can be cut on the night shift and ready at the will-call door by 7:00 am. Cutting is billed at 1.35×, material at book. Call the floor lead before you send the PO: (905) 555-0182, ext. 3.

Dwg HPP-WEB-003Sheet 3 of 5Capability

What we cut, and how thick.

Four cutting processes, a 400-ton press brake and seven grades of plate on the racks, painted by grade on the end.

What we can cut, and how thick

Sheet
1 of 3
Processes
4 machines, 7 grades

Each bar runs from the thinnest to the thickest plate we can cut in that grade on that machine, on a square-root scale so the thin end stays readable. Bars carry each grade's end-paint colour; the row for the plate in your estimate is outlined and the tick marks its thickness.

Material
Plasma
Oxy-fuel
Waterjet
Laser
A36 / 44Wstocked 3/16″–8″
3/16″ to 1-1/2″
1/4″ to 8″
3/16″ to 6″
3/16″ to 1″
350Wstocked 1/4″–4″
1/4″ to 1-1/2″
1/4″ to 4″
1/4″ to 4″
1/4″ to 1″
AR400stocked 3/16″–3″
3/16″ to 1-1/2″
1/4″ to 3″
3/16″ to 3″
3/16″ to 3/4″
AR500stocked 3/16″–2″
3/16″ to 1-1/2″
1/4″ to 2″
3/16″ to 2″
3/16″ to 1/2″
304 / 304Lstocked 3/16″–2″
3/16″ to 1-1/4″
Can’t cut
3/16″ to 2″
3/16″ to 3/4″
316 / 316Lstocked 3/16″–1-1/2″
3/16″ to 1-1/4″
Can’t cut
3/16″ to 1-1/2″
3/16″ to 3/4″
6061-T651stocked 1/4″–6″
1/4″ to 1-1/4″
Can’t cut
1/4″ to 6″
1/4″ to 1/2″

BAY 5 BURN FLOOR Two shifts, 6:00 am to 12:30 am, Monday to Friday

Burn tables

The numbers the estimator prices from, for mild steel. The row for your thickness is marked.

12 × 40 ft table, 400 A HD torch with bevel head. Shop rate $195/h.

ThicknessSpeed, mild steelKerfPierceToleranceHAZSetting
3/16″205 in/min0.062″0.3 s±0.030″0.016″130 A O₂ / air
1/4″170 in/min0.068″0.4 s±0.030″0.017″130 A O₂ / air
3/8″130 in/min0.085″0.6 s±0.030″0.019″130 A O₂ / air
1/2″100 in/min0.098″0.8 s±0.030″0.022″260 A O₂ / air
3/4″68 in/min0.118″1.2 s±0.030″0.027″260 A O₂ / air
1″50 in/min0.135″1.6 s±0.030″0.032″260 A O₂ / air
1-1/4″36 in/min0.152″2.4 s±0.045″0.037″400 A O₂ / air
1-1/2″26 in/min0.170″3.2 s±0.045″0.042″400 A O₂ / air

Speed factors against mild steel: A36 / 44W ×1.00, 350W ×0.98, AR400 ×0.90, AR500 ×0.85, 304 / 304L ×0.80, 316 / 316L ×0.78, 6061-T651 ×1.35.

Press brake

400-ton hydraulic brake, 14 ft between housings, CNC back gauge. Long bends over 10 ft are measured with a protractor at both ends and centre.

Longest bend at 400 tons on the 14 ft bed. Air bend, tons per foot = 575 × T² ÷ V × material factor.
ThicknessA36 / 44WV = 8T, R ≥ 1 × T350WV = 8T, R ≥ 1.5 × T304 / 316V = 8T, R ≥ 1 × TAR400V = 12T, R ≥ 4 × T
3/16″14 ft13.5 t/ft14 ft14.8 t/ft14 ft20.2 t/ft13.9 ft28.8 t/ft
1/4″14 ft18.0 t/ft14 ft19.8 t/ft14 ft27.0 t/ft10.4 ft38.3 t/ft
3/8″14 ft27.0 t/ft13.5 ft29.6 t/ft9.9 ft40.4 t/ft7.0 ft57.5 t/ft
1/2″11.1 ft35.9 t/ft10.1 ft39.5 t/ft7.4 ft53.9 t/ft5.2 ft76.7 t/ft
5/8″8.9 ft44.9 t/ft8.1 ft49.4 t/ft5.9 ft67.4 t/ftNot formed
3/4″7.4 ft53.9 t/ft6.7 ft59.3 t/ft4.9 ft80.9 t/ftNot formed
1″5.6 ft71.9 t/ft5.1 ft79.1 t/ft3.7 ft107.8 t/ftNot formed

Stock on the racks

Sheet
2 of 3
Grades
7, from 3/16″ to 8″

Every plate is painted on the end by grade before it goes on the rack, so nobody burns AR500 when the traveller says 44W. The rack below is drawn the way you'd see it from the aisle: one bay per grade, a plate end for every thickness we stock.

GradeSpecificationThicknessSheet sizes, inlb/ft² per inchEnd paint
A36 / 44WASTM A36 + CSA G40.21-44W dual cert3/16″ to 8″96 × 240, 96 × 288, 120 × 240, 120 × 28840.84White
350WCSA G40.21-350W / ASTM A572-501/4″ to 4″96 × 240, 96 × 288, 120 × 24040.84Green
AR400Quenched & tempered abrasion plate, 360–440 BHN3/16″ to 3″96 × 240, 96 × 28840.84Red
AR500Quenched & tempered abrasion plate, 470–540 BHN3/16″ to 2″96 × 240, 96 × 28840.84Violet
304 / 304LASTM A240, dual certified, HRAP finish3/16″ to 2″60 × 120, 72 × 144, 96 × 24041.62Ink line
316 / 316LASTM A240, dual certified, HRAP finish3/16″ to 1-1/2″60 × 120, 72 × 14441.62Ink line, double
6061-T651ASTM B209, stress-relieved plate1/4″ to 6″48 × 144, 60 × 144, 72 × 14414.05Brown
120 × 240, 28896 × 240, 28872 × 14460 × 120, 14448 × 1440120144240288
Stocked sheet sizes drawn to scale from a common corner. 96 × 240 is the workhorse.

Buying plate without cutting

Full sheets ship at the mill band price, with the MTR. Cut-to-size blanks are sheared or plasma-stripped to ±1/16″.

Drops and remnants

Remnants keep their heat numbers and sell by the pound at 15% under book. Ask for the remnant list; it changes every shift.

Not on the list

Hardox-type 450, 400F, A514, A516-70 pressure vessel plate and 5083 aluminum come in from the mill or a distributor in 7 to 10 working days.

Industries we cut for

Sheet
3 of 3
Main markets
Mining, farm, structural

Most of what leaves the yard is wear parts for the pits north of town, short-line farm equipment, and base plates for the structural shops along the Reach.

MATERIAL FLOW48.0024.006× Ø13/16 CSK 82° NEAR SIDE
Part no.HPP-ML-2448
MaterialAR500, 3/4″

Mining and aggregate wear parts

Chute and hopper liners, bucket lips and side cutters, crusher skirt boards, screen deck side plates. Waterjet for countersunk liner holes; oxy-fuel with preheat for heavy lips.

AR400, AR500, 3/16″ to 3″

18.008.00R4.00, Ø1-5/8 PINBURN, THEN DRILL PIN BORE ±.005
Part no.HPP-AG-0818
Material350W, 1″

Agricultural equipment

Hitch and tongue plates, clevis plates, tillage shank blanks, gussets and frame plates for short-line manufacturers. Burned, drilled and formed, shipped in kits by machine serial.

350W, 44W, AR400 for ground-engaging parts

20.0014.004× Ø1-5/8FOR 1-1/2 RODSØ2 GROUTW10 SHOWNDASHED
Part no.HPP-ST-2020
Material44W, 1-1/2″

Structural steel and construction

Column base plates, cap plates, shear tabs, gussets, splice and embed plates for fabricators and erectors, cut from 44W with MTRs, ready for CSA W59 shop welding in our bay.

44W, 350W, A572-50

Dwg HPP-WEB-004Sheet 4 of 5The shop

The shop, bays 4 to 7.

A family-run plate yard on Foundry Line: two shifts, CWB and ISO 9001, and a paper trail from the mill truck to your part.

Thirty-one years on Foundry Line

Sheet
1 of 4
Founded
1995
People
58, two shifts

Harrow started as one oxy-fuel table and a plate rack in Bay 4. It is still family-run, and still cuts most of its plate for the pits, farms and structural shops within a day's drive.

Ed Harrow bought a used oxy-fuel table in 1995 to cut wear liners for the gravel pits north of town. His sister Lorna ran the office, the books and the phone. The first rule of the shop came from her: every plate gets its heat number painted on the end before it goes on the rack, so a part can always be traced back to the steel it came from.

The racks grew, and so did the building. Bay 5 went up for the first plasma table in 2003. The waterjet arrived in 2012, after a mine asked for AR plate with no heat-affected edge. The press brake came in 2019 and the fiber laser in 2021. Lorna's son Pat Harrow runs estimating today, and the shop still answers its own phone.

What has not changed: we price from this month's mill band, we tell you which process we would run your part on and why, and the paperwork ships with the steel.

  1. 1995Bay 4 opens with one oxy-fuel table and a 40-foot plate rack.
  2. 2003Bay 5 built for the first plasma table. Second shift added.
  3. 2009CWB certification to CSA W47.1, Division 2.
  4. 2012Waterjet installed for AR and stainless with no heat-affected zone.
  5. 2019Bay 6: 400-ton press brake and two weld cells.
  6. 2021Fiber laser for thin plate to ±0.005″. Bay 7 becomes shipping.

The floor, bay by bay

Sheet
2 of 4
Area
4 bays, 62,000 ft²
Crane
10 t, full length

Plate comes in at Bay 4 and leaves at Door 6. It never doubles back, so every part on the floor is somewhere on the line between the rack and the truck.

Plan view, not to scale

10 T CRANE RAIL MTRCHECK PLASMA 1PLASMA 2OXY-FUELWATERJETFIBER LASER PRESS BRAKE 400 TWELD 1WELD 2 STAGING · DUNNAGEPACKING, PAPERWORK DOOR 6 OFFICE · ESTIMATING · QA PLATE IN · PARTS OUT BAY 4 · RECEIVING, RACKSBAY 5 · BURN FLOORBAY 6 · FORM, WELDBAY 7 · SHIPPING

Who you will talk to

  • Estimating

    Pat Harrow and two estimators

    Price every RFQ from the drawing and this month's mill band. Reply within four working hours.

    Ext. 1

  • Burn floor

    Day and night shift leads

    Run the nests, the rush burn queue and the will-call door. Call before you send a rush PO.

    Ext. 3

  • Receiving and QA

    J. Okafor

    Checks every mill test report against the PO before a plate comes off the truck.

    Ext. 4

  • Welding engineering

    R. Lindqvist, P.Eng.

    Signs off every welding procedure before it runs on the floor. On retainer.

    By appointment

Main line (905) 555-0182, then the extension.

Mill test reports and traceability

Sheet
3 of 4
Records kept
10 years

A mill test report ties a plate to the heat of steel it was rolled from: chemistry, yield, tensile and elongation, measured at the mill. We keep that link unbroken from the truck to your part, so a structural inspector or a mine's QA can trace any piece back to its heat.

Northgate Steel WorksPort Arden plate mill
Mill test certificateEN 10204 type 3.1
Heat no.
8B41207
Grade
A36-19 / G40.21-44W
Size
1.000 × 96 × 240 in
Pieces
6
Weight
39,204 lb
Customer PO
HPP-44817
Ladle chemistry, weight per cent
%CMnPSSiCuNiCrMoVNb
Heat0.171.050.0120.0060.210.180.080.090.020.0030.018
Spec≤0.230.50–1.50≤0.030≤0.040≤0.40≤0.60≤0.40≤0.30≤0.08≤0.10≤0.05
Tensile test, transverse, 8 in gauge
PropertyYieldTensileElong.CE (IIW)
Result52.1 ksi, 359 MPa71.4 ksi, 492 MPa26%0.38
Spec300 MPa min450–550 MPa20% min0.45 max

CE = C + Mn/6 + (Cr + Mo + V)/5 + (Ni + Cu)/15 = 0.17 + 0.175 + 0.023 + 0.017 = 0.38

The certificate behind the plate in today’s nest on table 2. Our receiving stamp means chemistry and mechanicals were checked against the purchase order before the plate was racked.
  1. Receive

    The MTR is checked against the PO grade, size and chemistry while the plate is still on the truck. A plate without a matching cert doesn't come off.

  2. Stencil

    Heat number, grade and our receiving tag are painted on the plate end, and repeated every 4 ft along one edge so every drop keeps one.

  3. Nest

    The heat number is carried into the job in the nesting software. Before the torch starts, the operator paint-sticks it onto the remnant side.

  4. Mark

    Each part is ink-marked with job, part and heat number. No hard stamping on AR plate, where a stamp mark can start a crack.

  5. Ship

    The MTR and our certificate of conformance travel with the packing slip, and a PDF goes to your inbox the hour it ships. Records are kept 10 years.

Safety and certifications

Sheet
4 of 4
Welding
CWB, CSA W47.1 Div. 2

Certificates are on file and sent with any quote that asks for them. Our welding engineer signs off every procedure before it runs on the floor.

  • CWB certified to CSA W47.1, Division 2

    Certificate 47-2318-HPP. Welding engineer R. Lindqvist, P.Eng., on retainer; two CWB Level II inspectors on staff.

  • CSA W59 structural welding

    Approved procedures for FCAW, GMAW and SMAW on 44W and 350W, GTAW on 304 and 316. Preheat and interpass logged on every heavy joint.

  • ISO 9001:2015 quality system

    Registration Q-26-0417 with Arden Quality Registrars. Annual surveillance audit, last passed June 2026.

  • Material traceability

    Heat-number control from receiving to shipping, MTRs kept 10 years. EN 10204 3.1 certificates on request.

Coming to the yard

  • CSA green-triangle boots, safety glasses and a hi-vis vest past the yellow line. We lend vests and glasses at the office.
  • Drivers stay in the marked box beside the cab while the 10-ton crane is lifting. Loads go on with magnet or vacuum lifters.
  • Bring your own dunnage and chain or straps. We can supply 4 × 4 dunnage at cost.
  • Will-call pickup at Door 6, 6:30 am to 3:00 pm. Call ahead for anything over 20,000 lb.

Dwg HPP-WEB-005Sheet 5 of 5Request a quote

Request a quote, reply in four hours.

Send the drawing and the details. An estimator replies within four working hours, 7:00 am to 4:30 pm, Monday to Friday.

Sending drawings

Sheet
1 of 3
Formats
DXF, DWG, STEP, PDF

Good files get quoted the same day. These are the things our programmers check before a part goes on a nest.

Flat parts: DXF or DWG

  • Drawn 1:1 in inches or millimetres, and say which.
  • Every cut contour closed. One gap of 0.002″ and the part won't cut (see Detail A).
  • Splines converted to arcs and lines. No duplicate or overlapping entities.
  • Cut geometry on its own layer; title block, dimensions and notes on another.
  • Etch or scribe lines on a layer called ETCH; bend lines on BEND.

Formed parts and weldments: STEP

  • STEP AP203 or AP214 of the finished part, plus a flat pattern if you've developed one.
  • Inside bend radius and bend direction called out. We'll develop the flat to our tooling otherwise.
  • Weld symbols per CSA W59 / AWS A2.4 on the PDF drawing.

Always include

  • A PDF drawing with grade, thickness, quantity, revision and any tolerance tighter than our standard.
  • Whether you need MTRs, and whether parts must come from one heat.
0.002 GAPDETAIL A, 40:1OPEN CONTOUR. WILL NOT CUT.

Standard tolerances

ProcessProfileEdge
Waterjet±0.010″ to 2″
±0.015″ to 4″
±0.020″ to 6″
Taper under 0.003″ per inch
Fiber laser±0.005″ to 1/2″
±0.010″ to 1″
Square, ISO 9013 range 2
HD plasma±0.030″ to 1″
±0.045″ to 1-1/2″
1–3° bevel on the drop side
Oxy-fuel±0.060″ to 2″
±0.090″ to 4″
±0.125″ to 8″
Square, drag lines, slag ground
Press brake±0.5° angle
±0.030″ per flange
Inside radius per tooling

Smallest hole that comes out round

ProcessRuleAt 1/2″
Plasma1 × thickness, 1/4″ minØ0.500″
Oxy-fuel1.5 × thickness, 1/2″ minØ0.750″
Waterjet0.1 × thickness, 1/16″ minØ0.063″
Laser0.75 × thickness, 1/8″ minØ0.375″

Email files to rfq@harrowplate.ca (up to 25 MB), or attach them to the request form below.

Request a quote

Sheet
2 of 3
Reply
Within 4 working hours

An estimator replies within four working hours, 7:00 am to 4:30 pm. Quotes are held for 15 days or until month end, whichever comes first.

Drawings
Drop files here or attach them. DXF, DWG, STEP or PDF, up to 25 MB in total.
    Paperwork

    Finding the yard

    Sheet
    3 of 3
    Exit
    Reach Road, Hwy 8
    Trucks
    North gate

    We are off Highway 8 at the Reach Road exit, second gate past the rail spur. Vests and glasses are lent at the office.

    HIGHWAY 8 REACH ROAD FOUNDRY LINE RAIL SPUR HARROW · BAYS 4–7 1180 FOUNDRY LINE DOOR 6 G MAIN GATE · CARS, WILL-CALL N NORTH GATE · TRUCKS EXIT
    Not to scale. Will-call parking is beside the office, inside the main gate.

    Cars and will-call

    Leave Highway 8 at Reach Road and turn right on Foundry Line. Take the second gate past the rail spur and park beside the office. Will-call pickup is at Door 6, the last door on the east end, 6:30 am to 3:00 pm.

    Trucks

    Use the north gate off Reach Road and wait in the marked box beside the cab while the crane lifts. Bring your own dunnage and straps, or buy 4 × 4 dunnage from us at cost. Call ahead for anything over 20,000 lb.

    Hours

    Office
    Mon–Fri, 7:00 am – 4:30 pm
    Shipping
    Mon–Fri, 6:30 am – 3:00 pm
    Burn floor
    6:00 am – 12:30 am, two shifts