Book a drop-off
1234567DECK HT 213.00EXPLODED 1:4108.00108.00BORE ø95.50 +0.010

Engine machine shop in Port Kessel, BC

Machined, measured, and written on the traveler.

Four of us, one surfacer, one boring bar, one engine dyno. We only do Nissan VQ V6s, the RB26 and Ford Modular V8s, so the torque plates, main-cap studs and spec sheets for your block are already on the shelf when it rolls in.

Dwg no.DEW-01
Scale1:4
Sheet1 of 8
RevF
Bench lead time
6 working days to the boring bar
Drop-offs
Tue to Thu, bay 3, 41 Foundry Row
Phone
604 555 0148
Inspection record, last deck off the surfacerTue 14:12
Job26-0419, VQ35HR
Flatness over 412 mm0.0004 in, 10 µm
FinishRa 0.52 µm
Checked byMOHPass
108.00108.00 ø95.500 +0.010/03 BORES, TORQUE PLATE ONø192 CBN FLY CUTTERPASS 2 OF 2, 0.05 mm, FEED 2.6 mm/REVOIL FEED ø8Ra 0.8⏥ 0.025OIL DRAIN-BACKWATER JACKET, OPEN DECK · COOLANT TRANSFER, 3×
PartCylinder block, LH bank deck
EngineVQ35HR
MaterialA356-T6, iron liners
Scale1:2
ShopDeckline Engine Works
PistonsAt TDC
Dwg no.DEW-0419-D1
Sheet1 of 8

The only engines we take in

VQ30DE3.0 V6
VQ35DE3.5 V6
VQ35HR3.5 V6
VQ37VHR3.7 V6
RB26DETT2.6 I6
4.6 / 5.4Modular V8

Next opening at the boring bar: 6 working days

Bring us the block. We write down every number.

Deckline Engine Works

Builds and pricing

Choose the engine and the machine work. The estimate, clearances and turnaround come out on the same sheet.

Sheets
02, 07
Prices
CAD, machine work
Rev
C

Spec your build

  1. 1.Pick the engine, how it will be fed, and an overbore. Everything below recalculates as you go.
  2. 2.Clearances shown are the numbers we set and write on your sheet.
  3. 3.Machine work only. Pistons, rings, bearings and gaskets are quoted separately.

Nissan VQ

Nissan RB

Ford Modular

How it will be fed
Pistons
Overbore

Finished bore 96.00 mm (3.7795 in). Bored on the torque plate, then plateau honed to size.

Block deck cut

Usually set by how much it takes to clean up. Raises compression a little; see the estimate.

Machine work
Assembly
VQ35DE3.5 L DOHC V6
Aluminum block, cast-iron liners
81.4⌀96.00oversize drawn 10×SECTION A–A, SCALE 1:2
MeasureStockYour build
Bore95.50 mm96.00 mm+0.50
Stroke81.40 mm81.40 mm
Displacement3,498 cc3,535 cc+37 cc, 216 ci
Compression10.3:110.45:1estimate
Bore / stroke1.1731.179

π/4 × 96.00² × 81.40 × 6 = 3,535 cc
bore and stroke in mm, divided by 1,000 for cc. Compression assumes your chambers and gasket stay stock; we cc the heads before the final number.

Piston to wall0.058 to 0.067 mm0.0023 to 0.0026 in
Top ring gap, NA0.0170 in0.43 mm, bore × 0.0045
Second ring gap0.0189 in0.48 mm, oil rails 0.015 in min.

Starting targets. The piston and ring makers’ spec cards win where they differ, and every number we set is written on your measurement sheet.

Machine-work estimateQ-26-1187
Nov 6, 2026
WorkQtyRateAmount
Hot tank and bake, block1 × $185.001$185.00$185.00
Hot tank and bake, cylinder head2 × $65.002$65.00$130.00
Dye penetrant, aluminum block1 × $140.001$140.00$140.00
Magnaflux, crankshaft1 × $55.001$55.00$55.00
Dye penetrant, cylinder head2 × $60.002$60.00$120.00
Deck block, per bank2 × $145.002$145.00$290.00
Surface cylinder head for MLS2 × $110.002$110.00$220.00
Bore and hone to 96.00 mm6 × $72.006$72.00$432.00
Torque plate setup, TP-VQ35 (pair)1 × $95.001$95.00$95.00
3-angle valve job, per valve24 × $28.0024$28.00$672.00
Head setup on the seat machine2 × $60.002$60.00$120.00
Balance rotating assembly, V6 with bobweights1 × $420.001$420.00$420.00
Assemble short block, clearances recorded1 × $890.001$890.00$890.00
Subtotal$3,769.00
GST 5%$188.45
PST 7%$263.83
Estimate, CAD$4,221.28
  • Parts (pistons, rings, bearings, gaskets) quoted at cost plus 12%.
  • Firm price after teardown and measuring. $250 deposit at drop-off.

Turnaround

  1. 1.Working days from drop-off, Monday to Friday.
  2. 2.Block work waits in the machining queue first; heads go straight to their own bench.
  3. 3.Parts on backorder stop the clock, and we tell you the day it happens.
JobDays
Heads onlyvalve job and surface
4 to 6
Bare blockdeck, bore and hone
11 to 14
Short blockmachined and assembled
16 to 20
Long blockheads, cams timed
21 to 26
Long block and dynobreak-in and sheet
23 to 28
Machining queue, 6 days this weekWork, when it goes to planWork, if it runs longRush work when the bench allows it: 25% surcharge, asked for at drop-off.

Deckline Engine Works

Bench and dyno

Every engine in the shop today, and the dyno sheets the finished ones leave with.

Sheets
03, 05
Board
Live, by job no.
Dyno
SAE J1349

On the bench

  1. 1.Every engine in the shop right now, by job number.
  2. 2.Your number is stamped on the brass tag wired to your block at drop-off.
  3. 3.Open a job to read its traveler entries.

Board updated Tue 17:00. 2 waiting on parts or approval.

Job

Work
Bore +0.5 mm to 86.50 for 2618 forgings, deck, line hone
Engine
RB26DETT, 2.6 L DOHC I6, twin turbo
Where
Bore & hone

Traveler entries, newest first

  1. 09:20MOHCyl 1–3 bored to 86.42, leaving 0.08 for the hone.
  2. Tue 14:00MOHLine hone done, mains 0.0002 in. round.
  3. Mon 08:30MOHDecked 0.06 mm, cleaned up full face.

Dyno sheets

  1. 1.Crank numbers off our engine dyno, corrected to SAE J1349.
  2. 2.Power is torque × rpm ÷ 5,252, so the lines cross at 5,252 rpm on a shared axis.
  3. 3.Every long block we break in leaves with a sheet like these.
EngineVQ35HR96.00 × 81.40 mm, 3,535 cc, forged 4032, 10.9:1 cc’d, stock cams, ported plenum
Job26-0371
DateSep 18, 2026
Barometer29.84 inHg
Air19 °C, 58 % RH
SAE J1349 CF1.012
0501001502002503003502,5003,0003,5004,0004,5005,0005,5006,0006,5007,0007,500Engine speed, rpm5,252hplb-ft321 hp @ 7,000277 lb-ft @ 5,000
Peak power321 hpat 7,000 rpm
Peak torque277 lb-ftat 5,000 rpm
Sweep2,500 to 7,500rpm, 94 pump
Operator notesRev limit 7,500. AFR 12.8 at peak torque. Two pulls within 1.5 hp.
Hover or tap the chart to read any point; arrow keys work too.

Deckline Engine Works

The shop

Four of us, three bays on Foundry Row, and a paper traveler on every engine since 2011.

Sheets
04, 06
Since
2011
Crew
4

Small on purpose

  1. 1.Opened in 2011 in one bay of 41 Foundry Row.
  2. 2.Three bays now, still four people.
  3. 3.Three engine families, so the tooling is always on the shelf.

Marta Okonkwo-Hale opened Deckline in 2011 with a used surfacer, a boring bar she rebuilt herself and one rented bay. The first customers were local 350Z and G35 owners who had spun a bearing at the track and could not find anyone who knew the VQ.

The RB26 work came with the import crowd a few years later. The Modular V8s came with the trucks, the Crown Vics and the old Thunderbirds. We added a line hone, a seat machine and, in 2019, the engine dyno in bay 3.

We have turned down a lot of work since then. Saying no to everything else is what lets us keep torque plates, studs and spec sheets for every block we take, and it means someone here has measured fifty of yours before.

  1. 2011

    One bay, one surfacer, VQ blocks only.

  2. 2014

    RB26 added. Dev joins on cylinder heads.

  3. 2016

    Ford Modular V8s. Bay 2 and the line hone.

  4. 2019

    Engine dyno and assembly room in bay 3. Teo joins.

  5. 2023

    Priya takes over the front counter and the dyno cell.

The four of us

  1. 1.The initials on your traveler belong to one of these people.
  2. 2.Whoever measured it is who you talk to about it.
  • Marta Okonkwo-Hale

    Owner, block machinist

    Red Seal machinist. Decks, bores, hones and line hones every block that comes through the door, and writes every quote.

    Signs Op 30, Op 40

  • Dev Rana

    Cylinder heads

    Valve jobs, seats, guides and head surfacing on his own bench, so heads never wait behind the block queue.

    Signs head sheets

  • Teo Lindqvist

    Assembly

    Mikes every bearing clearance, files every ring to gap and records torque fastener by fastener.

    Signs Op 50

  • Priya Sandhu

    Front counter and dyno

    Takes your engine in, stamps the brass tag, runs the wash bay and the dyno cell, and makes the 500 km call.

    Signs Op 10, 20, 60

What is in the building

Three bays at 41 Foundry Row. Machine shop in bays 1 and 2, assembly room and dyno cell in bay 3.

MachineBayWhat it does to your engine
Block surfacer, 192 mm CBN fly cutter1Decks blocks and heads flat and square for MLS gaskets
Boring bar with torque plates1Bores cylinders to size with the head-bolt load in place
Plateau hone1Final bore size and a 45° cross-hatch that holds oil
Line hone and alignment bar2Straightens and sizes the main bores
Seat and guide machine2Three-angle valve jobs, seats and guides
Balancer and 0.1 g scale2Matches pistons and rods, spins the crank to ±0.5 g
Granite plate and profilometer2Flatness and surface finish, written on your sheet
Engine dyno, load cell calibrated Jun 20263Break-in, leak-down and three corrected pulls
Routing, standard engine job

How a job moves through the shop

Each engine travels with this paper traveler. Nobody starts an operation until the one before it is signed off, and the traveler goes home with you.

Routing no.DEW-STD-07
RevisionC, Mar 2026
PartCustomer engine
  1. Op 10Front counter
    Intake and teardown

    Tagged, photographed, torn down. Every fastener bagged and labelled by location.

    A job number stamped on a brass tag, and photos of anything we find.

    PS
  2. Op 20Wash bay
    Clean and crack check

    Hot tank or aqueous wash, bake out, then magnaflux iron and steel, dye penetrant on aluminum.

    A pass, or a phone call before any money goes into machining.

    PS
  3. Op 30Inspection
    Measure and quote

    Bores at three depths on two axes, main bores, deck, crank journals, rod big ends.

    Your measurement sheet and a firm quote. Nothing gets cut until you say yes.

    MOH
  4. Op 40Machine shop
    Machine

    Deck, bore and torque-plate hone, line hone, valve job, balance: whatever the quote lists.

    Every finished size written next to its target.

    MOH
  5. Op 50Assembly room
    Wash and assemble

    Second wash, clearances miked, rings filed to gap, torque recorded fastener by fastener.

    An assembly sheet with bearing clearances, ring gaps and torque values.

    TL
  6. Op 60Dyno cell
    Dyno break-in

    Rings seated on the dyno, leak-down tested, three corrected pulls.

    The dyno sheet and a leak-down figure for each cylinder.

    PS
  7. Op 70Front counter
    Pickup

    Capped, bagged and strapped to a pallet or your own stand.

    All paperwork in the box. We call you at 500 km to check in.

Tolerances we hold

  1. 1.An MLS head gasket seals on a flat, smooth deck or not at all.
  2. 2.These are our own targets, usually tighter than the factory service limit.
  3. 3.Every one is measured on the granite plate and written on your sheet.
FeatureInchMetricHow we check it
Block deck flatness, MLS gasket≤ 0.0010 in overall
≤ 0.0005 in per 6 in
25 µm overall
13 µm per 150 mm
Straightedge and feelers, then an indicator sweep on the surfacer
Head deck flatness, MLS gasket≤ 0.0010 in25 µmGranite plate, seven-line straightedge pattern
Deck surface finish, MLSRa 16 to 32 µinRa 0.4 to 0.8 µmProfilometer, three traces per deck
Bore out of round≤ 0.0002 in5 µmDial bore gauge, thrust and pin axes
Bore taper≤ 0.0003 in8 µmDial bore gauge at top, middle, bottom of ring travel
Main bore alignment≤ 0.0004 in10 µmAlignment bar after line hone
Crank journal round and taper≤ 0.0002 in5 µm0.0001 in micrometer, two planes per journal
Valve seat runout≤ 0.0010 in25 µmSeat concentricity gauge, every seat
Rotating assembly±0.5 g—Bobweights built to 0.1 g on the scale

Thou to microns

Your FSM is in millimetres, your piston card is in inches. One tenth (0.0001 in) is 2.54 µm.

01020304050607080900.0001 in

0.00040 in = 0.0102 mm. Within our MLS deck flatness target.

Deck flatness

Straightedge in seven positions with feelers, readings in ten-thousandths. Worst line decides it.

.0002 .0004 .0003 .0004 .0003 .0001 .0002
Worst line
0.0004 in, 10 µm
Target
≤ 0.0010 in, 25 µm

Surface finish

-505±Raµm, evaluation length 4.0 mm, cutoff 0.8 mm
Ra of this trace
0.55 µm (22 µin)
Wanted
Ra 0.4 to 0.8 µm

Bore finish

Plateau hone on the torque plate: peaks knocked off, valleys left to hold oil.

45°
Cross-hatch
45° included, ±5°
Rpk
≤ 0.3 µm
Rvk
1.0 to 2.0 µm

Deckline Engine Works

Book and visit

Drop-offs are Tuesday to Thursday at bay 3. The booking form, hours and a site plan are below.

Sheet
08
Bay
3, Kiln Lane
Phone
604 555 0148

Book a drop-off

  1. 1.Drop-offs are Tuesday to Thursday so we can tag and tear down the same day.
  2. 2.Book a window and bring it to bay 3, round the back.
  3. 3.You leave with your job number stamped on a brass tag.
Drop-off requestFields marked * are needed
What’s coming in *
Window
No payment now. The $250 deposit is taken when you drop off.